March 2019
MANHOLE INSTALLATION
Rate this post
We install hundreds of manholes annually but this one is particularly big! To lift it we had to remove the bucket of the excavator which already weighs 29 tons. Our team of manoeuver will ensure that the bottom of the excavation is well leveled and compacter and it will be there for the next centenarians to come. It will be used to drain the Sacré-Coeur Hospital parking lot.