Juillet 2019
Projet Oxford
We lowered the height of that basement and stabilized the foundations with piles.
Project description
We made that basement 100% dry and liveable by lowering the height of the concrete slab. We also solved the sagging problem of those foundations by installing steel piles all the way to bed rock.
Duration
10
Jours
Employees
4
Workers
Equipment
2
Machines